It was a good weekend. The roof has been built and bolted to the lifters. I also installed the winch switch and wired it into the main junction box; there’s still a bit of cable arranging to do for the winch, but that will wait until the final adjustments can be made to the limit switches. Next on the list is ordering the aluminum for the roof, and then working on the final electrical details. After that is some plumbing, gas, and the final cabinet parts such as drawers and countertops.
Leave a Reply