This weekend I cut and installed the blocking for the bench seating, started installing the electrical, test fit the water tank, adjusted the linear actuators, and installed the bench seating. I also figured out where the batteries and the junction box will be installed.
Next on the list is building and installing the battery compartment, then installing the rest of the cabinets. With the cabinets installed, it will be time to start cutting into the walls and floor for appliances, wiring, plumbing, etc.